0011: Review decisions on a schedule

Status
Accepted
Date
Next review
Authors
Inkan maintainersfrom git

Context#

An ADR is written once, accepted, and then left alone. Two years later the vendor it chose has changed its pricing, the team that wrote it has moved on, and the record still says accepted because nobody was asked to look at it again. Decisions rot quietly: a wrong record looks exactly like a right one. The site tracks reviewBy for open records, so a proposal cannot sit past its deadline unnoticed, but once a record is decided its date stops meaning anything. Teams that do review their decisions keep the schedule somewhere else, in a calendar or a spreadsheet, where it drifts away from the records.

The lifecycle, the backlog and inkan check already know which records are in force. What was missing is a way to say “look at this again in a year” that lives in the record itself, and the places that read it: a page, a check rule, a command and a tool for agents.

This record is its own example: it carries reviewEvery: 1 year in its front matter, so it is due a year after its date and appears under “Scheduled” on this site.

Decision#

Decided records get a review schedule from three front matter fields and one interval that can be set once for a project or a site:

  • reviewBy on a decided record is the date of the next review. On an open record it keeps its meaning of decision deadline, tracked on /backlog/.
  • reviewed is the date of the last review.
  • reviewEvery is an interval such as 1 year. It can be set on the record, in _project.yml or as reviews.every in the config, in that order of precedence. never (or false) opts out.

A record is due on reviewBy, or reviewEvery after reviewed (or after its date when it has never been reviewed). Which statuses get reviews follows the lifecycle: reviews.statuses in the config, by default the ones with current: true (accepted and implemented).

The schedule is read in four places: the /reviews/ page lists what is overdue, due soon and scheduled; inkan check warns about overdue reviews; inkan reviewed and inkan reviews mark a review done and list what is due; the MCP server offers due_reviews and a review field on every record, which decisions.json carries too. Nothing changes status by itself: a review is a human reading the record and deciding whether it still holds.

How to use it#

Schedule one record#

Add reviewBy to a decided record for a one-off date, or reviewEvery for a recurring review:

decisions/payments/adr/0003-use-stripe-as-the-primary-payment-provider.md
---
title: "Use Stripe as the primary payment provider"
status: accepted
date: 2026-01-18
reviewBy: 2026-11-15
---
decisions/dbre/adr/0001-standardize-on-postgresql-16.md
---
title: "Standardize on PostgreSQL 16"
status: implemented
date: 2026-03-02
reviewEvery: 1 year
---

The first record is due on 15 November 2026. The second is due on 2 March 2027, then on 2 March 2028 once it has been reviewed, and so on.

Schedule a project or the whole site#

Most teams want one rule for everything rather than a field in every file. Set it once in _project.yml for a project, or in the config for the site:

decisions/dbre/_project.yml
name: "DBRE"
owners: [marek]
reviewEvery: 6 months
inkan.config.ts
export default defineConfig({
reviews: { every: '1 year', soon: 30 },
});

With reviews.every set, every record in a review status is scheduled from its date (which may come from git when the front matter has none; see Fill date and authors from git). A record or project that should not be reviewed opts out:

reviewEvery: never
OptionWhereDefaultWhat it does
reviews.everyconfignullInterval for every record in a review status. null or false schedules only records that carry reviewBy or reviewEvery themselves.
reviews.statusesconfigstatuses with current: trueWhich statuses get reviews. Records in other statuses are never scheduled, whatever their fields say.
reviews.soonconfig30Days before the due date from which a review counts as “due soon”, on the page and in the CLI.
reviewEvery_project.ymlnoneInterval for the project’s records. Overrides reviews.every.
reviewEveryrecordnoneInterval for this record. Overrides the project and the site.
reviewByrecordnoneFixed date of the next review (on a decided record).
reviewedrecordnoneDate of the last review. Written by inkan reviewed, or by hand.

Intervals#

An interval is a count and a unit, in the long or the short form:

UnitLong formShort form
days90 days, 1 day90d
weeks2 weeks2w
months6 months, 1 month6m, 6mo
years1 year, 2 years1y, 2yr

The count must be a whole number above zero; the space is optional and the plural s is too. Month and year steps clamp to the end of shorter months: a record reviewed on 31 January with reviewEvery: 1 month is due on 28 February, not on 3 March. Anything else, such as quarterly or 1.5 years, fails the build and is reported by check as review-interval; write 3 months or 18 months instead.

Which date wins#

The next review is computed from the fields in this order:

  1. The record is in a review status; otherwise there is no schedule, and reviewBy on an open record is a decision deadline for the backlog.
  2. reviewBy is the due date, unless reviewed is on or after it. A fixed date wins over the interval until it has been honoured.
  3. Otherwise the interval, taken from the record’s reviewEvery, then the project’s, then reviews.every, counted from reviewed, or from date when the record was never reviewed. never at any level stops the lookup: a project with reviewEvery: never is not scheduled even when the site sets reviews.every.
  4. No interval, or no date to count from: no schedule.
reviewByreviewedintervaldateNext review
2026-11-15noneanyany2026-11-15
2026-11-152026-11-201 yearany2027-11-20
2026-11-152026-11-20noneanynone (the fixed date was honoured)
none2026-04-016 monthsany2026-10-01
nonenone1 year2026-03-022027-03-02
nonenone1 yearnonenone

A review is overdue when its due date is before today, due soon when it is within reviews.soon days, and scheduled otherwise.

Mark a review done#

Read the record, decide whether it still holds, then record the review:

Terminal window
npx inkan reviewed dbre/adr/0001

This sets reviewed to today. When the record has an interval, the next review follows from it; a reviewBy that was just honoured is removed. Without an interval the command asks for one, --every 1 year, or for the next date, --next 2027-10-01. A record that no longer holds is a status change, not a review: run inkan status or inkan supersede instead. The command is described in Mark records reviewed from the CLI.

The reviews page#

/reviews/ lists every scheduled record in three groups: “Overdue”, “Due soon” and “Scheduled”. The groups are computed in the browser from the reader’s date, so a static build does not go stale. Each row shows the due date, the sticker, the team and number, the title and the interval. A “Periodic reviews” link appears in the sidebar hub as soon as any record has a schedule, and the header of a scheduled record shows “Next review” with the date and “Reviewed” with the last review date.

With nothing scheduled, the page says so and the sidebar link is not shown. A site that never sets reviews.every, reviewEvery or reviewBy on a decided record looks exactly as before.

In CI#

inkan check reports an overdue review as a review-due warning and a malformed interval as a review-interval error:

decisions/dbre/adr/0001-standardize-on-postgresql-16.md warning review every 1 year (due 2027-03-02) has passed; review it and run `inkan reviewed dbre/adr/0001-standardize-on-postgresql-16`

The starter workflow already runs check on every pull request, so an overdue review shows up as an annotation there and, with --strict, fails the job. See Check records in CI.

A review that only fails pull requests is easy to postpone. Add a scheduled job that lists what is due, so the team sees it even in a quiet week:

.github/workflows/reviews.yml
name: Decision reviews
on:
schedule:
- cron: '0 8 * * 1' # Monday 08:00 UTC
workflow_dispatch:
jobs:
reviews:
runs-on: ubuntu-latest
steps:
- uses: actions/checkout@v4
with:
fetch-depth: 0 # dates may come from git history
- uses: actions/setup-node@v4
with:
node-version: 22
- run: npm install
- run: npx inkan reviews --within 30 | tee reviews.txt
- run: npx inkan check --strict # fails the job when a review is overdue

Replace the last step with whatever reaches your team: gh issue create --body-file reviews.txt, a message to a chat channel, or nothing but the job log. inkan reviews --json prints the same list for scripts, and inkan mcp serves it to agents as due_reviews.

For agents and scripts#

decisions.json carries a review field per record: { "due": "2027-03-02", "reviewed": null, "every": "1 year" }, or null when the record has no schedule. The MCP server returns the same object from get_record and lists what is due with the due_reviews tool (project, within, all). An agent that works in the repository can therefore answer “which decisions should we look at this month” without reading every file. See decisions.json and MCP server for agents.

Consequences#

  • Every decision in force has a date by which someone looks at it again, and that date lives in the record, in the same pull request flow as everything else.
  • One line in the config schedules an entire archive. Teams that do not want this see no change: without reviews.every, a project interval or fields on the records, nothing is scheduled.
  • reviewBy means two things, decided by the status. It keeps old records and the backlog working, at the cost of a field whose meaning depends on another field. Records that are accepted with a stale reviewBy from their proposal days become due at once; run inkan reviewed once to move on to the interval.
  • A review is a date, not a verdict. The site cannot tell a careful review from a quick inkan reviewed; that stays with the people and the pull request review.
  • Dates inferred from git make records from imports and old files schedulable without edits, and also make them due early: a file added in a migration commit counts from that commit. Write date or reviewed where that is wrong.
  • Intervals are calendar steps in UTC, so a review due on the 31st moves to the 30th or 28th in shorter months and stays there once reviewed is written on that day.
  • “Today” is the local calendar day everywhere: of the machine for check, inkan reviews and MCP, of the reader for /reviews/. A CI runner in UTC and a reader in another time zone can still disagree for a few hours around midnight.

History 1

  1. AcceptedInkan maintainers9e5e535 commit diff